Updated Feb-2024 Test Engine to Practice Test for E_S4HCON2023 Exam Questions and Answers!
SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Certification Sample Questions and Practice Exam
NEW QUESTION # 16
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:
- A. /ASU/SSM (ASU Simple Schedule Manager)
- B. /ASU/START (Start ASU Toolbox)
- C. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
- D. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
Answer: B
NEW QUESTION # 17
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests in the file umodauto.Ist
- B. By searching for transport requests that are assigned to the project SAP_ADJUST
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests named <SID>K0<number>
Answer: A
NEW QUESTION # 18
ICNV initialization does 3
- A. Creation of flag
- B. AA
- C. Creation of views
- D. Build index on flag column
Answer: A,C,D
NEW QUESTION # 19
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. As part of the cleanup process
- B. Before the downtime starts
- C. At the end of the downtime
- D. Early in the downtime
Answer: B
NEW QUESTION # 20
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for target release, Windows, SAP HANA
- D. Kernel for source release, Windows, SAP MaxDB
Answer: C,D
NEW QUESTION # 21
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file sumabap conf during registration
- B. The path was stored to the environment of user <sid>adm during registration
- C. The path is taken from the URL entered in the browser to start SUM
- D. The path was stored in file host_profile during registration
Answer: A
NEW QUESTION # 22
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. The errors from the SI checks must be solved, otherwise. SUM will report an error
- B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- C. You need to build up an SI check framework by applying SAP Notes
- D. The SI checks are executed in the development system and the results are transported into the subsequent systems
Answer: B,C
NEW QUESTION # 23
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
- B. Unicode conversion Database migration SAP S/4HANA conversion without database migration
- C. Unicode conversion SAP S/4HANA conversion including database migration
- D. Unicode conversion SAP S/4HANA conversion without database migration Database migration
- E. SAP S/4HANA conversion including database migration and Unicode conversion
Answer: A,B,C
NEW QUESTION # 24
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. PARDIST_SHD
- B. TABIMJJPG
- C. PARMVNT_UPG
- D. TABIM_SHADOW_*
Answer: B
NEW QUESTION # 25
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. The corrections to the SUM Guide
- B. AA
- C. An overview about possible upgrade paths
- D. The link to different patch levels to SUM
Answer: A,C,D
NEW QUESTION # 26
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Modification adjustment (SPDD)
- B. Activation of dictionary objects (ACT_UPG)
- C. Switch to new repository (EU_SWITCH)
- D. Conversion of application tables (PARCONVJJPG)
Answer: A,B
NEW QUESTION # 27
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
- C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
Answer: C
NEW QUESTION # 28
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
- A. Using R3load and memory pipes
- B. Using R3load and file transfer
- C. Using work processes and network socket connection
- D. Using R3load and network socket connection
Answer: A
NEW QUESTION # 29
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:
- A. The major SUM Guide
- B. The DMO Guide
- C. The Application Guide
- D. The SAP S/HANA Conversion Guide
Answer: B,D
NEW QUESTION # 30
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In Process Control Center
- B. In SUM Phaselist
- C. In SUM Parameters
- D. In DMO Migration Preparation
Answer: A,C
NEW QUESTION # 31
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. These are 40 pairs of Reload processes, so there are 80 R3load processes running.
- B. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.
- C. SUM is still running in uptime; the 40 defined Reload processes are considered.
- D. Without table contents comparison, only 40 R3load processes are being started.
Answer: D
NEW QUESTION # 32
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION # 33
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
- A. Use the Near Zero Downtime Maintenance Technology (NZDM).
- B. Choose the instance number of the shadow instance.
- C. Keep archiving on during the whole procedure.
- D. Reuse a profile for the shadow instance from a previous run.
Answer: B,D
NEW QUESTION # 34
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. SE80 (Object Navigator)
- B. ATC (ABAP Test Cockpit)
- C. SYCM (Simplification Database Content)
- D. SAT (Runtime Analysis)
Answer: A,B
NEW QUESTION # 35
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Unicode conversion
- B. Database migration
- C. Custom code analysis
- D. Software update
Answer: B,D
NEW QUESTION # 36
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
- A. Perform an SAP S/4 HANA conversion without DMO
- B. Upgrade the SAP system
- C. Use DMO for SUM
- D. Perform an SAP S/4 HANA conversion including DMO
- E. Apply SAP support packages
Answer: B,C,E
NEW QUESTION # 37
......
Certification dumps SAP Certified Technology Specialist E_S4HCON2023 guides - 100% valid: https://dumpstorrent.exam4pdf.com/E_S4HCON2023-dumps-torrent.html